| Overview |
Curtain wall envelope to all sides of five storey office building. The natural anodised, mainly single glazed curtain walling is set 800mm away from the inner secondary wall of the building to allow air to circulate. As the mullions are fixed to cantilevered steel walkways at intermediate levels, all deadloads are transferred down to the ground floor level. |
| Client |
Kirklees Metropolitan Council |
| Contractor |
Bardsley Construction LTD |